联系我们

公司名称:XXX

电话:XXX

手机:XXX

联系人:XXX

地址:XXX

新闻动态
漏光或漏风量测定是对通风空调施工质量的一项检验措施
风管安装前未清除内部杂物
The internal sundries of the air duct are not removed before installation
风管安装前应清除内、外杂物,并做好清洁和成品,施工后及时封堵管口,如不清除杂物,将会造成系统阻力增大,严重时堵塞过滤网和管道。
Before the installation of the air duct, the internal and external sundries shall be removed, and the cleaning and finished products shall be well prepared. After the construction, the pipe orifice shall be blocked in time. If the sundries are not removed, the system resistance will increase and the filter screen and pipeline will be blocked in serious cases.
2、风管系统安装后不按规定作漏光、漏风检查和试验
2. After the installation of the air duct system, the light and air leakage inspection and test are not conducted according to the regulations
漏光或漏风量测定是对通风空调施工质量的一项检验措施,必须严格按要求规范进行检验,若风管系统安装后不按规定作漏光、漏风检查和试验,可能泥杆 保定古筝 塑料增韧剂 拱形护坡模具 保定空调维修  托辊生产线会造成系统大量漏风,使整个系统和项目工程达不到使用要求,增加不必要的返工和浪费,同时也浪费了能源。
The measurement of light leakage or air leakage is an inspection measure for the construction quality of ventilation and air conditioning, which must be inspected in strict accordance with the requirements and specifications. If the air duct system is not inspected and tested according to the regulations after installation, it may cause a large amount of air leakage in the system, make the whole system and project project fail to meet the use requirements, increase unnecessary rework and waste, and waste energy at the same tim

联系方式

  1. 公司名称:XXX
  2. 电话:XXX
  3. 手机:XXX
  4. 联系人:XXX
  5. 地址:XXX

版权 © 洛阳通风管道知名加工厂 网址:qibijiq.89ix.com  推荐:洛阳通风管道,洛阳螺旋风管,洛阳消防厨房排烟

流水槽模具 电缆井模具 隔离墩模具 钢纤维 拱形骨架模具 u型槽模具 邢台电动门 保定空调维修 精密铸造 网站建设及优化保定遨游网络公司